Menu
Log in


Log in

Completed Task Groups

List of Task Groups completed and delivered their task.

TG2.2  BIM Basics for Digitalization (Cancelled)
TG3.6  Artificial Intelligence in Structural Engineering
TG3.5  SED book entitled "Time-dependent behavior and design of composite steel concrete structures"
TG3.6  Artificial Intelligence in Structural Engineering
TG6.3  Structural Design with Recycled Aggregate Concrete

TG4.1 Bearings & Joints

TG4.2 Applicable Standards And Actions During Construction Stage

TG4.3 Essentials on Construction Methods State Of Art
TG4.4 Risk, Accidents And Incidents During Construction

TG4.5 Monitoring in Construction
TG4.6 Specific Constructive Challenges in Cable Stayed & Extradosed Bridges

TG4.7 Scheduling in Different Construction Methods
TG4.8 Building Equipment Specifications

TG4.9 Cost Efficient Design

TG4.10 Logistics for Bridge Construction
TG4.12 Floating Bridges Construction

TG4.13 Construction Methods With New Materials
TG4.14 Special heavy lifting equipment

TG4.15 Essentials on Foundation Construction
TG4.16 Suspension Bridges

TG4.17 Modular Bridges

TG4.18 Arch Bridges

TG4.19 Summary On Critical Recommendations On Bridge Construction Methods And Processes



IABSE
Jungholzstrasse 28
8050 Zurich
SWITZERLAND

Location: Map Info

Have a question?
+41 43 443 97 65
secretariat@iabse.org

Bank details: Click here.
Privacy Policy

Follow Us
on Social Media